Design, permits and grid connection at very low prices.

How we work

Engineering & grid connection

We design PV plants, battery storage systems and grid connections at very low prices, and handle the full administrative path: design, approvals and grid-connection paperwork.

  1. 1Technical design
  2. 2Approvals and permits
  3. 3Grid connection
Engineering & grid connection

Our project

Ardino: a park with “Strela” solar trackers

A technical design (2026) for powering the park lighting in Ardino from a solar system with a battery, electrical and structural parts. The generator is 4 “Strela” 2P solar trackers – our own design and development. The system covers the lighting almost entirely from March to October, and in winter the grid supplies only about 8% of the annual consumption.

4

“Strela” 2P solar trackers – our own design and development

15,6 kWp

24 bifacial TOPCon modules of 650 W, 6 per tracker

96,4 kWh

LiFePO₄ battery with a 25 kW hybrid inverter in one cabinet

165%

of the park lighting's annual consumption

Electrical design

  • Azimuth sun tracking with a fixed 45° tilt – the tilt was chosen by simulating night-load coverage, not annual yield
  • 2 strings of 12 modules on separate MPPT inputs; voltages checked from −20 °C to +70 °C
  • IP65 DC boxes with disconnector and SPD at the columns, cables in ducts in a trench
  • The lighting runs from the inverter's backup port; with an empty battery it switches to the grid in under 10 ms
  • Lighting control by battery charge: all-night and midnight modes
  • Zero export to the grid, earthing and lightning protection for every column

Structural design

  • A shared reinforced-concrete foundation slab for two trackers in a row, with 100 × 100 cm columns
  • Foundation level −1.40 m, C25/30 concrete, B500B reinforcement
  • Lower module edge at least 2.6 m above ground – the trackers stand in a pedestrian area
  • Foundation layout along the existing retaining wall of the alley

How the Strela tracker works →

Parts of the design

The drawings are in Bulgarian.

Site plan: 4 “Strela” trackers, storage system and park-lighting board; cable trench profile
Site plan: 4 “Strela” trackers, storage system and park-lighting board; cable trench profile
Single-line diagram: trackers, DC boxes, the hybrid inverter with its battery and the lighting board
Single-line diagram: trackers, DC boxes, the hybrid inverter with its battery and the lighting board
Formwork plan of the foundation for two trackers in a row
Formwork plan of the foundation for two trackers in a row
Foundation layout of the 4 trackers
Foundation layout of the 4 trackers

Click a drawing to open it full size.